NPI parts stop slipping without an owner.
The NPI Tracker and its executive detail show 30, 60 and 90-day delinquency by owner. Item Review puts a part's jobs, transactions, POs, BOM and customer orders on one page. Orders Without BOM catches the gap before the floor does.
| Part | Program | Owner | Age | Gate |
|---|---|---|---|---|
| 61-2207-1 | Nacelle kits | R. Ortiz | 94 d | First article |
| 44-0912-3 | Rotor hub | D. Patel | 61 d | Tooling |
| 72-5560-2 | AV-8 spares | M. Chen | 18 d | Drawing review |
What changes when Engineering is live
As built, in the order your team meets it
Screens shown are rendered stand-ins for the real views; production screenshots use seed demo data with customer names and part numbers replaced.
NPI Tracker
Open NPI items by program, owner and gate, with aging and the next gate due date from the workflow. Filters by site and customer; saved views per lead.
- Age and 30/60/90 banding
- Owner and gate from the workflow instance
- Filters by program, customer, site
NPI Executive Detail
The one-page view for the VP: delinquency by band and by owner, trend over the last eight weeks, the three oldest items named.
Item Review
Part summary, jobs, transactions, purchase orders, BOM and customer orders for one part number, read from the warehouse. The page an engineer opens when a part is late or short.
| Section | Rows | Latest |
|---|---|---|
| Jobs | 6 | J-118802 · OP40 · in process |
| Transactions | 41 | Issue 12 ea, 10/16 |
| Purchase orders | 3 | PO-55719 · due 10/22 |
| Customer orders | 2 | CO-30917 · ships W43 |
Orders Without BOM
Booked customer orders whose part has no BOM structure in the ERP, by site and due date, so the gap is closed before release.
- Daily exception list
- Owner assignment to engineering
- Clears automatically when the BOM lands
Nothing is written to your ERP
Engineering is a module of CONOPS | MOS (Manufacturing Operating System). It reads from the platform warehouse, which pulls change-only loads nightly from each site's ERP over a linked server. The ERP is never written to, and adding a site is configuration, not code.
- Part master
- BOM structure
- Job orders
- Purchase orders
- Customer orders
- Labor and material transactions
By role
NPI lead
Owns the tracker and the gate dates.
Engineering manager
Balances load across owners; reads the executive detail.
Planning
Watches Orders Without BOM before release.
One platform, shared records
See your NPI list with an owner and an age on every line.
We show the tracker, the executive view your VP would read, and the Item Review page an engineer opens when a part is in trouble.