Run the day and the week on an operating system, not spreadsheets.
Workcenter Capacity, Staffing Plan, a KPI Dashboard driven by a data-driven KPI catalogue with plan targets, and the Production Control reports your schedulers live in: Schedule Compliance and the Dispatch List. The Intelligence Layer flags the top risks before the meeting starts.
On-time start 76.3% vs 90% target. Late-start Pareto: 45% material staging.
CNC-5 loaded at 118% in week 44. Overtime or re-route needed.
Assembly-1 8% over productivity target. Document and replicate.
What changes when Operations is live
Make the day, make the week, run the system
Screens shown are rendered stand-ins for the real views; production screenshots use seed demo data with customer names and part numbers replaced.
Dispatch List
Role-based views for supervisor, lead, planner and operator. Filters by site, workcenter, shift, priority and program. Hot-list and expedite tags carry reason codes so the churn is measurable.
- Operation cards: job, op, qty, due, standard hours, constraints
- Hot list and expedite tags with reason codes
- Filters by site, workcenter, shift, priority
| Seq | Job / Op | Part | Qty | Due | Flag |
|---|---|---|---|---|---|
| 1 | J-118802 / 40 | 61-2207-1 | 12 | 10/20 | Hot |
| 2 | J-118790 / 20 | 44-0912-3 | 48 | 10/21 | Expedite |
| 3 | J-118811 / 10 | 72-5560-2 | 6 | 10/23 | |
| 4 | J-118744 / 30 | 18-3301-1 | 24 | 10/24 |
Schedule Compliance and on-time start
Planned versus actual start by operation, late-start aging and Pareto by root cause: material, tooling, program, QA, downtime, staffing. Exceptions go to an owned queue.
Workcenter Capacity
Load versus available hours by workcenter and week, rolling. The bottleneck is highlighted and scenarios for overtime, headcount, outsourcing and re-routing can be compared before the scheduling meeting.
Staffing Plan
Heads needed versus current by skill and shift, derived from the load. Gaps are forecast by week, and cross-training priorities fall out of the skills that are short most often.
- Required vs available hours by skill and shift
- Staffing gap forecast by week
- Cross-training priorities
KPI Dashboard with targets
A data-driven KPI catalogue defines each measure once, with plan targets by site, workcenter and period. Tiles show value, target and health. Productivity, utilization, clear-to-build and on-time start ship in the catalogue; add your own.
Intelligence Layer
Each data change produces a KPI snapshot: value versus target and health. A decision-support engine configured with manufacturing heuristics evaluates the variance, ranks the top risks and returns a structured insight: priority, why it matters, an action flag and a recommended owner function. The action flag opens an action plan in Records.
- Priority, context, action flag, owner function per insight
- Rules such as clear-to-build below 90% flags a supply risk
- Top risks generated before the weekly meeting
Clear to build 86% on Nacelle kits. Two POs late from one OSP vendor. Owner: Materials.
Productivity below 92% at Deburr for 3 weeks. Standard-work review. Owner: Ops.
Schedule compliance 81% on 2nd shift, staffing-coded. Owner: Planning.
Operating cadence packs
The daily production meeting (25 minutes) and the weekly forecast and scheduling meetings open on auto-generated packs: yesterday's results, today's plan, constraints, the ship-risk list and the top risks from the Intelligence Layer. Actions are captured live with owner and due date and land in the action log.
| Block | Source | Min |
|---|---|---|
| Ship risk list (R/Y/G) | Program Management | 15 |
| Capacity vs load, 6 weeks | Workcenter Capacity | 15 |
| Top 3 risks | Intelligence Layer | 15 |
| Open actions and owners | Action log | 15 |
Nothing is written to your ERP
Operations is a module of CONOPS | MOS (Manufacturing Operating System). It reads from the platform warehouse, which pulls change-only loads nightly from each site's ERP over a linked server. The ERP is never written to, and adding a site is configuration, not code.
- Job orders and operations
- Labor transactions
- Backlog and customer orders
- Shipments
- Part master
- Workcenter and shift calendars
By role
Production control / scheduler
Owns the dispatch list, schedule compliance and the capacity view.
Supervisor / cell lead
Works the dispatch list by shift; codes late starts.
Plant manager
Opens the KPI dashboard first; runs the daily and weekly cadence.
VP Operations
Reads the cross-site roll-up and the top risks.
See tomorrow's dispatch list and this week's capacity picture from your data.
We show the dispatch list a supervisor prints, the capacity view a scheduler argues with and the KPI dashboard a plant manager opens first.