Project plans your PMO and your engineers both use, with the floor's work rolled in.
Project, Milestone, Task and Subtask in one hierarchy, viewed as a list, a board or a Gantt. Dependencies, percent-complete roll-up, multi-site sharing and a resource calendar, on the same database as your records and workflows.
What changes when Projects is live
As built, in the order your team meets it
Screens shown are rendered stand-ins for the real views; production screenshots use seed demo data with customer names and part numbers replaced.
Project, Milestone, Task, Subtask
A fixed four-level hierarchy keeps plans consistent across sites. Percent complete rolls up from subtasks; dates roll up from the latest child.
- Four levels, same on every site
- Roll-up of dates and completion
- Owners and watchers per level
- Templates for recurring project types
List, board and Gantt views
Switch views without changing data. Filters and saved views are per user; the Gantt shows dependencies and the critical path.
| To do | In progress | Blocked | Done |
|---|---|---|---|
| Order plate stock | Machine base | Weld jig (vendor) | Design approved |
| Inspect locators | Program OP20 | Order clamps | |
| Dry run | Kickoff |
Dependencies and critical path
Finish-to-start links with lag; the critical path is highlighted and the slip is quantified on the milestone.
- Finish-to-start dependencies with lag
- Critical path highlight
- Slip in days on each milestone
Resource calendar
See who is loaded where across projects, by week. The calendar respects site holidays and shift patterns.
Multi-site sharing
Share a project with another site while Row-Level Security keeps every other row where it belongs. Corporate sees the roll-up across sites in one view.
- Share by project, not by database
- Corporate read-only roll-up
- Per-site numbering and calendars preserved
Nothing is written to your ERP
Projects is a module of CONOPS | MOS (Manufacturing Operating System). It reads from the platform warehouse, which pulls change-only loads nightly from each site's ERP over a linked server. The ERP is never written to, and adding a site is configuration, not code.
- Job orders (link tasks to jobs)
- Part master and BOM structure (for NPI projects)
- Customer orders (dates for program projects)
By role
PMO
Owns the Gantt, the critical path and the monthly review pack.
Engineering lead
Works the board; attaches records and workflow steps to tasks.
Site leadership
Reads milestone status and slip across projects.
See a capital project, an NPI and a kaizen on one board.
Bring one live project plan. We rebuild it in the demo environment and show the Gantt, the roll-up and how floor records attach to tasks.