CONOPS A product of CONOPS
Workflow design

Bring the paper. Leave with the template.

Workshops that convert the approval paper and NPI gates your people already follow into CONOPS | MOS (Manufacturing Operating System) workflow templates: queues instead of names, outcomes instead of signatures, dates anchored to the customer order, escalation that does not depend on memory.

Workflows · Template · First-article buy-off
FAI package submitted Quality review Dimensional pass? Customer source inspection Released to rate
StepQueueDurationEscalates to
Quality review Quality 2 d Quality manager
Customer source inspection Contracts 5 d Program manager
Rework (send-back) Originator 3 d Engineering manager
A template as it leaves the workshop: nodes, queues, durations and escalation.
The workshop

Two hours per template, three templates in the first engagement

  1. Walk the paper

    The owners narrate the form, the signatures and the exceptions. We draw it as it really runs, not as the procedure says.

  2. Name the queues

    Each signature becomes a department queue with a duration and an escalation path, so absence does not stop the chain.

  3. Set the outcomes and dates

    Approve, approve with changes, reject, defer. Dates schedule backward from the customer-order date where one exists.

  4. Run it in staging

    The real owners run one instance end to end, send one back, and read the ledger. Then it is versioned with an effective date.

Starting templates

Three we bring to every first engagement

Diagrams of all three are available as sample downloads on the resources page.

ECN approval
Design review, impact decision, quality approval, customer notification where flow-downs require it, release. Rework loops to the originator with the reviewer's notes.
NPI gate review
Drawing review, tooling plan, quality plan, first-article, release to floor, scheduled backward from the customer-order date so the late gate shows red early.
First-article buy-off
FAI package, quality review, dimensional decision, customer source inspection, release to rate. Every outcome on the ledger for the customer's auditor.
Deliverables
Three templates live in staging and versioned; a one-page diagram and owner sheet per template; auto-launch rules by record category.
Duration
One to two weeks, three workshops of two hours each plus testing.
Who we need
Engineering or quality lead, 8 hours; operations lead, 6 hours; contracts, 2 hours where a template touches the customer.
Exit criteria
Each template run once by its real owners, one send-back exercised, ledger export reviewed.
Next step

Book a workflow workshop.

Two hours, one of your approval chains, modelled end to end with the queues, outcomes and escalation your people already follow informally.